井控常用缩写词汇
(2011-01-21 09:30:51)
标签:
杂谈 |
AD----------assistant
driller
AMW-------active mud
weight
ASL--------average stand
length
bbl-----------barrel
bpm---------barrels per
minute
BOP---------blowout
preventer
cap.----------capacity
CM----------concurrent
method
CMW-------current mud
weight
CSG---------casing
DC----------drill
collar
Disp.--------displacement
DM----------driller’s
method
DP-----------drill
pipe
DPC---------drill pipe
capacity
DPCED-----drill pipe closed end
displacement
DPG---------drill pipe
gauge
DPMD------drill pipe metal
displacement
DS-----------drill
string
DS-----------drilling
supervisor
DS-----------drilling
superintendent
DT-----------drilling
team
ECD---------equivalent circulating
density
Eff.----------efficiency
EMW-------equivalent mud
weight
EOB-------- end of
build
FCP---------final circulating
pressure
FMDPP-----final maximum drill pipe
pressure
FOSV-------full open safety
valve
FP-----------formation
pressure
FR-----------flow
rate
ft-------------foot
gal-----------gallon
gpm---------gallons per
minute
HCRV-------hydraulically controlled remote
valve
HP-----------hydrostatic
pressure
ICP----------initial circulating
pressure
ID------------internal
diameter
IMDPP------initial maximum drill pipe
pressure
KC----------Kelly
cock
KD----------kick
data
KOP---------kick off
point
KSV---------Kelly safety
valve
KWM-------kill weight
mud
MAASP----maximum allowable annular surface pressure 最大允许环空套压
MD----------measured
depth
min.----------minutes
MW----------mud
weight
OD----------outer
diameter
OMW-------original mud
weight
pcf-----------pounds per cubic
foot
PG-----------pit
gain
POOH------pull out of
hole
pp------------pump
pressure
ppf-----------pounds per
foot
ppg----------pounds per
gallon
psi-----------pounds per square
inch
PV-----------plastic
viscosity
RF-----------rig
floor
RIH---------run in
hole
SCRP-------slow circulating rate
pressure
SF-----------safety
factor
SICP--------shut in casing
pressure
SIDPP------shut in drill pipe
pressure
Sk.sx--------sack,
sacks
SPM--------strokes per
minute
SPP---------slow pump
pressure
Stk----------stroke
TDS--------top
drive
TH----------top
hole
TIH---------trip in
hole
TVD--------true vertical
depth
V------------velocity
Vol.---------volume
VT-----------volumetric
technique
WD---------well
dada
WWM------wait and weight
method
WSS--------well site
supervisor
YP----------yield
point