加载中…
个人资料
  • 博客等级:
  • 博客积分:
  • 博客访问:
  • 关注人气:
  • 获赠金笔:0支
  • 赠出金笔:0支
  • 荣誉徽章:
正文 字体大小:

'The Water Cube

(2009-11-03 09:07:41)
标签:

'the

water

cube

北京租车

北京商务租车

北京旅游租车

旅游

分类: 北京景点推荐
      The National Aquatics Centre, known as 'The Water Cube', will be one of the most dramatic and exciting venues to feature sporting events for the Beijing Olympics in 2008.
     The interior of the Centre also makes a strong impression
In July 2003, the consortium of Arup, architecture firm PTW, the CSCEC (China State Construction and Engineering Corporation) and the CSCEC Shenzhen Design Institute (CSCEC+DESIGN) won the international design competition for the National Aquatics Centre for the 2008 Beijing Olympics.
The competition, which was judged by a panel of international architects, engineers and pre-eminent Chinese academics, commenced with submissions from ten international consortia and also involved a public exhibition and vote.
      The Water Cube looks set to be ready in October 2007. Both the concrete and the steel structure have been completed, and 500 m² of prototype cladding was installed in April, 2006. The next phase is to install all of the cladding and then follow on with de-propping the internal structure and completing the interior.
      The building's structural design is based on the natural formation of soap bubbles
To arrive at the building's structural design, which is based on the natural formation of soap bubbles to give a random, organic appearance, we used research undertaken by Weaire and Phelan (professors of physics) into how soap bubbles might be arranged in an infinite array.
To bring the design to life, the individual bubbles are incorporated into a plastic film and tailored like a sewing pattern. An entire section is pieced together and then put into place within the structure. There are interior and exterior films, and the film is then inflated once it is in-situ. It will be continuously pumped thereafter.
The actual pumping has been sub-contracted, and once the installation is complete the operator will be responsible for both the operation and maintenance of the facade for ten years. This was a key component of the brief and in the choice of contractor.
       The project is an opportunity for us to offer our expertise in sustainable services. The building will use solar energy to heat the pools and the interior area, and all backwash water is to be filtered and returned to the swimming pools.
The scheme and design for the project was developed in Australia. The project has now been handed over to a team in Beijing who are taking care of the construction.

0

阅读 收藏 喜欢 打印举报/Report
  

新浪BLOG意见反馈留言板 欢迎批评指正

新浪简介 | About Sina | 广告服务 | 联系我们 | 招聘信息 | 网站律师 | SINA English | 产品答疑

新浪公司 版权所有