Bicentennial Civic Center
标签:
杂谈 |
分类: 3.公共建筑篇 |

这座综合行政中心是为阿根廷科尔多瓦省两百年纪念而修建,其处于城市边缘,临靠
城市铁道和河流。周围众多的住宅区被河流和铁道分开,这座建筑的出现改观了这个
区域的现状,修建两座行车道联系两岸交通。
城市铁道和河流。周围众多的住宅区被河流和铁道分开,这座建筑的出现改观了这个
区域的现状,修建两座行车道联系两岸交通。
建筑分为A栋和B栋。分成三期建设,现在第一期已经完工。
A栋是一个中高层的混凝土棱体,高度45米,宽度26米,在16米的高度做了20度的折
面,这个折面又影响到上层形态,建筑的一系列三角形折面形成特殊的光影。为了让
建筑更具立体感,建筑师在三角形折面上做出棱形的镂空,傍边配以浅水池,形成具
有标示性的建筑形象。
B栋是一个低矮平展的停车场和管理建筑。该建筑的语言从A栋发展演变。其最大的特
色是绿色,B建筑的表皮金属网可爬满攀缘植物,调节微气候,冬暖夏凉。B建筑平层
顶上做成屋顶花园。办公区域从屋顶花园上冒出来,外表玻璃幕墙反映着天空,绿色
花园还有A栋的形态。
二期完成后将进行第三期的会议中心建设,会议中心将有一部分掩埋在土地中,形成
人造的山丘与周围的公园交融。

The Bicentennial Civic Center will be the first administrative complex to have been
designed specifically for that end by the Province of Córdoba, Argentina.
It is located on the edge of the historic center of the city, on a lot that used to belong to
the railway tracks.
the River Suquia,
neighborhoods on both sides of the river.
the image of the river as backyard of the city, thus transforming the whole sector into a
new downtown front.
In order to enhance this transformation, new vehicular infrastructure consisting of two
bridges across the river and connecting roads has been built; and the landscaping of
the River Suquia Promenade -started many years ago- has been completed.
Center
consists of two buildings, A and B.

Building A
A medium-rise building housing the ministries dominates the complex: a faceted prism
made out of concrete. It is based on a square
cuboid 45 meters high and with a side
measuring 26 meters, which at a height of 16 meters suffers a 20-degree rotation. This
movement generates a more complex morphology based on triangles, which in turn
produces a very particular play of shadows and light. To avoid the flat character
present in the early studies for the triangular facades produced by the rotation, a series
of geometric rhomboid-based combinations were explored in order to instill tri-
dimensionality to the very planes of the facades.
The prism is placed over a shallow
pool, which can easily be emptied to work as a civic plaza housing events.
A medium-rise building housing the ministries dominates the complex: a faceted prism
made out of concrete.
measuring 26 meters, which at a height of 16 meters suffers a 20-degree rotation.
movement generates a more complex morphology based on triangles, which in turn
produces a very particular play of shadows and light.
present in the early studies for the triangular facades produced by the rotation, a series
of geometric rhomboid-based combinations were explored in order to instill tri-
dimensionality to the very planes of the facades.
pool, which can easily be emptied to work as a civic plaza housing events.

In a second stage of the project the administrative area will be completed, and a
Convention Center will be built as a third and final stage.
be partially buried, and will take the shape of an artificial, grass-covered hill, in
continuity with the adjacent landscaped areas.
CREDITS AND DATA:
Project title: CENTRO CIVICO DEL BICENTENARIO
Location: Córdoba, Argentina.
Client: Government of the Province - Córdoba
Completion / construction: 2011- 2012
Architects: GGMPU Arquitectos – Gramática/Morini/Pisani/Urtubey + Lucio Morini
Project Manager:Arq. Guillermo Pozzobón
Collaborators: Arqs. Julia Garayoa, Adrián Castagno, Verónica Gordillo, Diego Andres
Gómez, Mariana Pelliza, Guadalupe Daher, Cecilia
Villareal, Luciana Antonucci,
Agustín Elies, Gonzalo Manzanares.
Consultants: Fragueiro & Novillo Ings., Arq. H. Pasetti, Ingenia, Tecnoseguridad, M.
Mangupli & CIA, Peusso , Twins Ingenieria, Vanoli & Associates, Decibel, Tecno
Riego, Del Bianco & Associates.
Building area: 24.781,60m2
Construction Company: ELECTROINGENIERIA S.A
Project title: CENTRO CIVICO DEL BICENTENARIO
Location: Córdoba, Argentina.
Client: Government of the Province - Córdoba
Completion / construction: 2011- 2012
Architects: GGMPU Arquitectos – Gramática/Morini/Pisani/Urtubey + Lucio Morini
Project Manager:Arq. Guillermo Pozzobón
Collaborators: Arqs. Julia Garayoa, Adrián Castagno, Verónica Gordillo, Diego Andres
Gómez, Mariana Pelliza,
Agustín Elies, Gonzalo Manzanares.
Consultants: Fragueiro & Novillo Ings., Arq. H. Pasetti, Ingenia, Tecnoseguridad, M.
Mangupli & CIA, Peusso , Twins Ingenieria, Vanoli & Associates, Decibel,
Riego, Del Bianco & Associates.
Building area: 24.781,60m2
Construction Company: ELECTROINGENIERIA S.A
PHOTO © CLAUDIO MANZONI & LEONARDO FINOTTI &
GGMPU+LUCIO MORINI




Building B
In contrast with Building A, Building B is a horizontal slab and houses administrative
functions.
interrelationships and social events.
including the rhomboids but changing their scale.
On top of this rests a green volume, which is enclosed by a metal mesh enabling
deciduous vines to climb freely.
to reach the building in winter while sheltering it in the summer.
and is covered by grass and flowers.
large area free of partitions so that offices can be arranged as desired.
The Governor´s house is placed over this plane and consists of a single story
freestanding object with mirror-clad faces, with alternating reflections of the sky and the
green plane over which it rests.












前一篇:世界的大都会——纽约
后一篇:墨西哥:美好人生旅店

加载中…