项目名称:瑞京路K2+100~+228.78段及K2+810~+980段5%水泥稳定层标高复测
|
序号 |
桩号m |
桩 位 |
后视m |
视线高m(仪高m) |
前视m(中视m) |
实测高程m |
路面设计高程m |
5%水泥稳定层顶高程m |
高差值m |
左 |
右 |
备 |
||
|
宽度m |
高差m |
宽度m |
高差m |
|||||||||||
|
1 |
Z2 |
|
0659 |
10.339 |
|
9.68 |
|
|
|
|
|
|
|
BM设计高程点 |
|
2 |
K2+228.78 |
中桩 |
|
|
0659 |
9.68 |
9.687 |
|
|
|
|
|
|
|
|
3 |
K2+200 |
中桩 |
|
|
0935 |
9.404 |
9.431 |
9.321 |
-0.083 |
|
|
|
|
|
|
4 |
|
左边桩 |
|
|
1064 |
9.275 |
9.326 |
9.216 |
-0.059 |
7.00 |
-0.105 |
|
|
|
|
5 |
K2+180 |
中桩 |
|
|
1226 |
9.113 |
9.175 |
9.065 |
-0.048 |
|
|
|
|
|
|
6 |
|
左边桩 |
|
|
1330 |
9.009 |
9.07 |
8.96 |
-0.049 |
7.00 |
-0.105 |
|
|
|
|
7 |
K2+160 |
中桩 |
|
|
1480 |
8.859 |
8.927 |
8.817 |
-0.042 |
|
|
|
|
|
|
8 |
|
左边桩 |
|
|
1590 |
8.749 |
8.822 |
8.712 |
-0.037 |
7.00 |
-0.105 |
|
|
|
|
9 |
K2+140 |
中桩 |
|
|
1691 |
8.648 |
8.743 |
8.633 |
-0.015 |
|
|
|
|
|
|
10 |
|
左边桩 |
|
|
1746 |
8.593 |
8.638 |
8.528 |
-0.065 |
7.00 |
-0.105 |
|
|
|
|
11 |
K2+120 |
中桩 |
|
|
1759 |
8.580 |
8.633 |
8.523 |
-0.057 |
|
|
|
|
|
|
12 |
|
左边桩 |
|
|
1889 |
8.450 |
8.501 |
8.391 |
-0.059 |
8.80 |
-0.132 |
|
|
|
|
13 |
K2+100 |
中桩 |
|
|
1976 |
8.548 |
8.567 |
8.457 |
-0.091 |
|
|
|
|
|
|
14 |
|
左边桩 |
|
|
1791 |
8.363 |
8.395 |
8.285 |
-0.078 |
11.50 |
-0.1725 |
|
|
|
|
15 |
转点 |
|
1341 |
9662 |
2018 |
8.321 |
|
|
|
|
|
|
|
转点 |