Check power tongs and spinning
rope are on drill floor. 检查动力钳和尾绳是否在钻台
-
What’s the weight on
bit? 钻压是多少?
-
What is the BHA of this
well? 这口井的下部钻具如何组合?
-
Drill out
cement. 钻穿水泥
-
Drill out 20” casing
shoe. 钻穿20”套管鞋
-
Latch the
elevator. 扣吊卡
-
Unlatch the
elevator. 开吊卡
-
Set the slips.
放卡瓦
-
Adjust the
crown-o-matic (crown saver). 调整防碰天车
-
Lock the hook
pin. 锁紧大钩销子
-
Check OD of
stabilizer. 检查扶正器的外径
-
Perform leak off
test. 进行地层破裂(或:渗漏)测试
-
Connect kill and choke
line. 接上压井和放喷管线
-
Reverse out the drill
pipe. 反循环清洗钻杆
-
Make a short
trip. 进行短途起下钻
-
Change the
cutters. 换割刀
-
Slug the pipe.
灌重泥浆
-
Drill the stand
down. 钻完立柱
-
Start/run the shale
shaker. 开振动筛
-
Start the
desanders. 开除砂器
-
Start the
desilters. 开除泥器
-
Change it with a 40
mesh screen. 换成40目筛布
-
Shut it off.
关掉
-
Pull it to the cat
ramp. 把它拉到坡道上去
-
Make a fast
connection. 接单根要快
-
Don’t dump the mud
into the sea. 不要把泥浆排放到海里
-
Disconnect it with a
chain tong. 用链钳卸开
-
Put a thread
protector. 加一个(丝扣)护箍
- Can we use the power slips? 可以使用动力卡瓦吗?
Casing and Cementing 下套管与固井
-
Run in hole to bottom
for wiper trip. 下钻通井
-
This is the casing
program. 这是套管程序
-
Prepare for running
casing. 准备下套管
-
Make everything ready
for running 7”casing. 做好下7”套管的准备
-
Make cementing
job. 固井
-
Displace cementing with
mud pump. 用泥浆泵替泥浆
-
Set cement plug from
2940 to 2790m. 在2940到2790米井段打水泥塞
-
Pick up cementing
head. 接水泥头
-
Cement samples are
hard. 水泥样已凝固
-
Pump in 3 cubic meters
of spacer. 注3方隔离液
-
Pump down the
plug. 泵压(胶)塞
-
Wait on cement.
候凝
-
The guide shoe will be
connected. 接引鞋
-
Connect the floor
collar. 接浮箍
-
Connect the air line to
the casing stabbing board. 接好套管
扶正台的气管线
-
Run casing with the
350T slip elevator. 用350吨卡瓦式吊卡下套管
-
Clean and dry 20”
casing threads with rags. 清洁并擦干20”套管丝扣
- Where is the rabbit for drifting the casing? 套管通径规在哪里?