Chengdu Taichuang Electric Maintenance Department fine repair motor soft starter, frequency converter, thyristor power regulator, DC panel power motherboard, driver board, trigger board fault maintenance case sharing --AB Rockwell soft starting gate open circuit fault test success. For inquiries, please write to jane at 13908182700@163.con


Tianjin customer sent a Rockwell soft start, start the alarm, want to repair spare.

Check as follows

Brand: AB Rockwell

Model number: 150-F108NBD

Current: 108A

Power: 55KW

Fault: The power supply display is normal, and the alarm is immediately triggered. The fault number is 7 pole open R.                                                                 

Maintenance idea: The thyristor gate opening is one of the AB Rockwell soft start is not good to judge the fault, before encountered the situation of sending repair, controller head bad situation, occasionally host and controller are bad, almost all are industrial control master admire dinner, after all, AB Rockwell soft start our maintenance experience is the most rich.

This soft start, the initial judgment is the controller fault, fortunately is started on the report, the fault point is good to confirm some, before there should be a failure many times, after each restart can run for a period of time, until completely can not work. In the operation of the alarm open circuit fault, especially the alarm is not timed, this is more difficult, simulation is the key, then according to the schematic diagram to repair the controller.

After the controller is repaired, the host test runs for more than ten seconds and the alarm is not loaded, which still takes most of the day until it starts normally. After the reliability test, it has been sent to Tianjin. The fault is rectified.



 

 

 

 