加载中…
个人资料
mist高乐高
mist高乐高
  • 博客等级:
  • 博客积分:0
  • 博客访问:58,474
  • 关注人气:435
  • 获赠金笔:0支
  • 赠出金笔:0支
  • 荣誉徽章:
相关博文
推荐博文
谁看过这篇博文
加载中…
正文 字体大小:

U.s. Gulf of Mexico oil leak sealing method

(2010-06-26 21:28:27)
标签:

杂谈

  

U.s. Gulf of Mexico oil spill, to the local ecological and environmental impact is deeply saddened by the disaster, in at the same time, it should be mobilized, blocked drain tubing, reducing disasters continue to spread.

 Highlight the wisdom that was better than nothing.

After a careful and meticulous consideration, I think the following method can be blocked drain tubing:

 The first groundwork leaking tubing on the rocks below the three holes, three holes into the distribution of an equilateral triangle, leakage tubing in the center of the triangle; in three holes in mounting bolt with earrings to spare.

Then, make a cone-shaped Cone and tubing welded into one of the above, the trumpet tubing installed fixed three earrings standby; trumpet following welding a homemade special box, inside of which are equipped with three sets of removable card u-shaped pipe, a set of v-location appliances; pipe clamp half U-shaped card is stationary and the other half of the u-shaped card is piston and screw screw-driven, pipe-card u-shaped surface fixed asbestos rope made of leakage of cushions, two pipes butt Department designed a bump in the shape of the plug connector, docking is not straight, conducive to seal the gap; pipe clamp around the body in the remaining space also needs to be strictly together with sealing for piston; v-position correction is left and right sides respectively equipped with a v-shaped steel fork, fork through the v-shape of the mouth of the move, you can make in a v-shaped cross intraoral leak tubing and tubing to form a straight line, easy accuracy of u-shaped card can not inclined, no partial to stall leaked tubing.

      Finally ready to three sets of underwater using pulley, underwater robots.

Preparations are finished, you can officially start work by blocking install boat lift-ready device, in the tubing ready earrings hanging on separately prepared in advance, the robot wheel traction, to oil spills, close to oil spills, the robot at the other end of the pulley and the ground anchor earrings on; tubing is connected to the pulley under tension and leaking oil pipe butt, leaking oil through the Centre, custom-made box at the top of the Cabinet Office and tubing flared butt, mouth of the tube tubing leak may be ragged, not smooth, even and tubing connection, but still have a small amount of oil leakage, which is available through the box of v-shaped orthoses, move to the drain tubing and tubing in a straight position, then the robot from the top down, turn the fastening three u-card, first after U card, there may be fastened a small amount of leakage, but there will be no more pressure, the second, third, u-shaped card, ensure that no leakage of oil spills, to the intergrated.

0

阅读 评论 收藏 转载 喜欢 打印举报/Report
  • 评论加载中,请稍候...
发评论

    发评论

    以上网友发言只代表其个人观点,不代表新浪网的观点或立场。

      

    新浪BLOG意见反馈留言板 电话:4000520066 提示音后按1键(按当地市话标准计费) 欢迎批评指正

    新浪简介 | About Sina | 广告服务 | 联系我们 | 招聘信息 | 网站律师 | SINA English | 会员注册 | 产品答疑

    新浪公司 版权所有