1PP- First Phase of Production Prove-Out 第一次试生产
3C Customer(顾客导向)、Competition(竞争导向)、Competence(专长导向)
4S Sale, Sparepart零配件,
Service, Survey信息反馈
5S 整理,整顿,清理,清洁,素养
8D- 8 Discipline
ABS Anti-lock Braking
System
AIAG
美国汽车联合会
ANPQP Alliance New Product Quality Procedure
Apportionment 分配
APQP Advanced Product Quality
Plan
Backlite Windshield 后窗玻璃
Benchmark Data 样件资料
bloodshot adj.充血的, 有血丝的
BMW Bavarian Motor Works
C.P.M Certified Purchasing
manger 认证采购经理人制度
CB- Confirmation Build 确认样车制造
CC- Change CutOff 设计变更冻结
CC\SC- critical/significant characteristic
CCR Concern & Countermeasure
Request
CCT Cross Company Team
Characteristics Matrix
特性矩阵图
COD Cash on Delivery
货到付现 预付货款(T/T in
advance)
CP1- Confirmation Prototype 1st 第一次确认样车
CP2- Confirmation Prototype 2nd 第二次确认样车
Cpk 过程能力指数Cpk=Zmin/3
CPO Complementary Parts
Order
Craftsmanship 精致工艺
Cross-functional teams 跨功能小组
CUV Car-Based Ultility
Vehicle
D1:信息收集;8D
D2:建立8D小组;
D3:制定临时的围堵行动措施,避免不良品流出;
D4:定义和证实根本原因,避免再发;
D5:根据基本原因制定永久措施;
D6:执行和确认永久措施;
D7:预防再发,实施永久措施;
D8:认可团队和个人的贡献。
DCC Design Change Control
DFA- Design For Assembly 面向装配的设计
DOE Design Of
Examination试验设计
DQES Delivery Quality Evaluation System
DTL Direct To Line
DVP&R Design Validate Plan&Report设计验证计划报告
EDI electronic data interchange
电子数据交换
entire adj. 全部的, 完整的, 整个
ERP Enterprise Resource
Planning
ES Engineering
Specification工程规格
ESI Early Supplier Involvement
供应商先期参与
Ex-Work(工厂交货)、FOB(船上交货)、FAS(船边交货)或CIF(运保费在内交货)
FEU- Field Evaluation Units 用户市场实际体验与评估
first gear 一档
Flow Chart 流程图
FMEA Failure Mode and Effects
Analysis
four-wheel drive 四轮驱动
FRG- Ford Reliability Guideline
福特可靠性指导
Front Windshield 前挡风玻璃
Tempered glass 钢化玻璃
front-wheel drive 前轮驱动
FSS- Full service supplier 全服务供应商
FTA Fault Tree Analysis
GD&T- Geometric Dimensioning & Tolerancing 标准公差
GR&R Guage
Repeatability&reproducibility量具的重复性和再现性
grief-stricken adj. 极度忧伤的
heavy rain 大雨
high wind n.疾风
HTFB- Hard Tooling Functional Build 工装集成调试与验证
IPO Individual Parts Order
ISIR Initial Sample Inspection
Report
JIT Just In Time
KD- knocked down/ Semi Knock Down(SKD) /Completely Knock Down(CKD)
KO Kick-off
Laminated glass 夹层玻璃
LP-Lean Production 精益生产
LR Launch Readiness
LS Launch Support
LVPM Local Vendor Packaging
Method
MPV Multi-PurposeVehicle 多用途汽车
MRD Material Required Date
MRO Maintenance,Repair,and
Operation
MTP- Make to print supplier 照图加工供应商
N/A- Not Applicable
NCDR Non-Conforming Delivery
Report
NCMAR Non-Conforming Material
Action Report
NDA Non Disclosure
Agreement
保密协定
NDS Nissan Design
Specification
NML Nissan Motor Ltd
NVH- System Noise, Vibration & Harshness 系统噪音,振动及粗糙性
onetime adj.过去的,从前的
OSM- Outside of Material
OTC Over The Counter
非处方药,可在柜台上卖的药
PA Program Approval
pallet n. 托盘
Passenger Vehicle 乘用车
PAT- Program Attributes Team 产品属性小组
PDL Product Design Letter
PH
Proportions&Hardpoints
PIPC- Percentage of Indexes with Process Capability 能力指数百分比
PIST- Percentage of Inspection points Satisfying Tolerance 检测点满意工差百分比
PMT- Program Moudle Team 产品模块小组
PO Purchase Order
PPAP- Production Part Approval Process 生产件批准程序
PPSR Production Preparation
Status Report
PQA Process Quality
Assurance
PR Program Readiness
Pre-Launch 试生产
price-driven costing 价格引导成本
Production Preparation-Final
Nissan - PT2/Renault - PP
Production Preparation-Initial Nissan -
PT1/Renault - PPP3
Production Trial Run 试生产
Prototype 样件
QFD Quality Funtion
Deploy质量功能展开
QFTT Quality Functional Task
Team
QR- Quality Reject 质量拒收
QS
Quality
Standard
RAN Release Authorisation
Number
reverse 倒车档
RFQ Request For
Quotation询价
RKD Reverse Knock Down
RLQ Receiving Lot
Quantity
ROC Rate of Climb
ROI return on investment
报酬率
ROP Re-Order Point
RTO Required To Operate
SAIS Supplier Assessment &
Improvement System
SC Strategic
Confirmation/significant Charac'teristics
SDS- System/ Design Specifications 系统/设计说明
second gear 二档
SFMEA System FMEA
Shipping Date 出货日、Invoice
Date 发票日或On Board
Date 装船日
Side Windshield 侧窗玻璃
SJ Strategic Intent
SNP Standard Number of Parts
SOW- state of work 工作申明
SPC Statistical Process
Control
SQA Supplier Quality
Assurance
SREA- Supplier Request for Engineering Approval 供应商工程设计更改申请
ST Surface Tranfer
STRS Supplier Test Report
System
Subcontractor 分承包商
Sunroof Windshield 天窗玻璃
SUV Sports Utility
Vehicle
TAG Test Aptitude
Graphique
TCO Total Cost of
Ownership 总持有成本
TCRA Total Cost Reduction
Activity
TGR Things Gone Right
TGW Things Gone Worst
TM Techinical Manual
TPM Total Preventive
Maintenance
TTO-Tool Try Out 工装验证
UOM Unit Of Measure
3C
4S
5S
8D- 8 Discipline
ABS
AIAG
ANPQP Alliance New Product Quality Procedure
Apportionment 分配
APQP
Backlite Windshield
Benchmark Data
bloodshot adj.充血的, 有血丝的
BMW
C.P.M
CB- Confirmation Build 确认样车制造
CC- Change CutOff 设计变更冻结
CC\SC- critical/significant characteristic
CCR
CCT
Characteristics Matrix
COD
CP1- Confirmation Prototype 1st 第一次确认样车
CP2- Confirmation Prototype 2nd 第二次确认样车
Cpk
CPO
Craftsmanship
Cross-functional teams 跨功能小组
CUV
D1:信息收集;8D
D2:建立8D小组;
D3:制定临时的围堵行动措施,避免不良品流出;
D4:定义和证实根本原因,避免再发;
D5:根据基本原因制定永久措施;
D6:执行和确认永久措施;
D7:预防再发,实施永久措施;
D8:认可团队和个人的贡献。
DCC
DFA- Design For Assembly
DOE
DQES Delivery Quality Evaluation System
DTL
DVP&R Design Validate Plan&Report设计验证计划报告
EDI
entire adj. 全部的, 完整的, 整个
ERP
ES
ESI
Ex-Work(工厂交货)、FOB(船上交货)、FAS(船边交货)或CIF(运保费在内交货)
FEU- Field Evaluation Units 用户市场实际体验与评估
first gear 一档
Flow Chart
FMEA
four-wheel drive 四轮驱动
FRG-
Front Windshield
Tempered glass
front-wheel drive 前轮驱动
FSS- Full service supplier 全服务供应商
FTA
GD&T- Geometric Dimensioning & Tolerancing 标准公差
GR&R
grief-stricken adj. 极度忧伤的
heavy rain 大雨
high wind n.疾风
HTFB- Hard Tooling Functional Build 工装集成调试与验证
IPO
ISIR
JIT
KD- knocked down/ Semi Knock Down(SKD) /Completely Knock Down(CKD)
KO
Laminated glass
LP-Lean Production
LR
LS
LVPM
MPV
MRD
MRO
MTP- Make to print supplier 照图加工供应商
N/A- Not Applicable
NCDR
NCMAR
NDA
NDS
NML
NVH- System Noise, Vibration & Harshness 系统噪音,振动及粗糙性
onetime adj.过去的,从前的
OSM- Outside of Material
OTC Over The Counter
PA
pallet n. 托盘
Passenger Vehicle
PAT- Program Attributes Team 产品属性小组
PDL
PH
PIPC- Percentage of Indexes with Process Capability 能力指数百分比
PIST- Percentage of Inspection points Satisfying Tolerance 检测点满意工差百分比
PMT- Program Moudle Team 产品模块小组
PO
PPAP- Production Part Approval Process
PPSR
PQA
PR
Pre-Launch
price-driven costing
Production Preparation-Final
Production Preparation-Initial
Production Trial Run
Prototype
QFD
QFTT
QR- Quality Reject
QS
RAN
reverse 倒车档
RFQ
RKD
RLQ
ROC
ROI
ROP
RTO
SAIS
SC
SDS- System/ Design Specifications
second gear 二档
SFMEA
Shipping Date
Side Windshield
SJ
SNP Standard Number of Parts
SOW- state of work 工作申明
SPC
SQA
SREA- Supplier Request for Engineering Approval
ST
STRS
Subcontractor
Sunroof Windshield
SUV
TAG
TCO
TCRA
TGR
TGW
TM
TPM
TTO-Tool Try Out 工装验证
UOM


加载中…