标签:
杂谈 |
果岭设计
By
John Lafoy, ASGCA Past President
标签:
杂谈 |
Green Design
果岭设计
By
John Lafoy, ASGCA Past
President
作者:约翰
标签:
杂谈 |
标签:
杂谈 |
What is Links Golf ? 什么是林克斯高尔夫? 翻译:张旭 |
标签:
高尔夫球场球车道沙坑杂谈 |
标签:
高尔夫球场设计球车道球车杂谈 |
高尔夫球场一定要球场道吗?球车一定是高尔夫文化中的一部分吗?
请看高尔夫球场设计大师 Tom Doak (汤姆多克) 的评述,中文翻译部分仅供参考!
A L I F E O N T H E R O A D
路上的生活
Published in Michigan Golfer, September/October 2002 issue
发表于《密歇根高尔夫球手》,2002年九月十月刊
In 1989, with two courses in northern Michigan under my belt, I
bought a house in Traverse City. In the years since, I’ve spent
nearly half my days out of town, and I haven’t worked within 200
miles of home. Why? I place a lot of the blame on cart paths.
1989年,我们负责两个在北密歇根的球场,我在Traverse城买了一匹马。从那年起,我的一半时间都在镇外面,同时,我们从来没有在离家200英里以内的地方工作过。为什么呢?我对球车道很不满!
I have nothing against golf carts -- for Casey Martin, for seniors, or for anyone who needs them on a hot and humid day. A few carts a day won’t do as much damage to the turf as the maintenance vehicles do. But
标签:
高尔夫球场pacificdunes前9洞世界百佳杂谈 |
标签:
高尔夫球场设计价值杂谈 |
标签:
杂谈 |
有需要高尔夫球场建造各个方面,草坪养护各个方面翻译的朋友
可以发邮件联系我,turf2004@126.com
标签:
高尔夫球场建造喷灌规范杂谈 |
第一章:特殊条件
1-01 竣工时间
本规范包括的所有工作条款的竣工时间应该和高尔夫球场建设的进度计划相关联。参见段落2.06。
1-02包商对图纸及规范的修改
没有设计师的书面批准,包商不得对规范及图纸做任何修改。
1-03工作的变更、改变、删除及增加
在工作进行的任意阶段,设计师有权对包含在图纸及规范中的工作做任何变更、删除及增加。对此,包商不得有任何异意,并且不能影响工程竣工时间,除非得到设计师的同意。
如果设计修改涉及到额外增加机械设备或人工,已方应该在协调好费用后提供要求的设备和人工。
所有因变更、删除、增加工作而达成的协议都应该为书面形式,并得到设计师的认可。
1-04材料
除非做了特别说明,否则,作为永久使用的材料必须为新的、质量一流的材料,并与以下规范的具体内容相一致。
1-05现有结构、设施的保护
包商应该谨慎施工,避免破坏现有的设施、结构、具有考古意义的场地、以及业主财产范围内的地面和地下设施。图纸上所示的结构位置为业主和设计师所熟悉,图纸是基于所提供的最好的信息而制作的。包商应该尽全力维护自然